Lyndhurst
Supply and Install Sydney Metro Only
- 5.0m long x 4.0m wide
Supply and Install Sydney Metro Only
STANDARD INCLUSIONS (Stage 1)
Lock up stage only
- Engineered and approved design.
- Supply of all materials.
- Galvanized structural support posts concreted with 20mpa strength.
- High tensile steel floor frame (10 years manufactures warranty).
- Yellow tongue and groove flooring sheets.
- T2 termite resistant wall and roof framing timber mgp10.
- Galvanized steel bracing to comply with AS1684.2 – 2006
- Ametalin silver sarking 97% reflective fire rated.
- James hardie 300mm fire rated fibre cement weatherboard cladding.
- Ametalin silver sarking 97% reflective fire rated.
- Aluminum sliding windows with fly screen 900mmW x 900mmH x 3
- Solid core external timber door with security locks 820mm x 1
- H3 F/J primed fascia board bullnose and DAR.
- James hardie fibre cement eave sheets.
- High performance foil backed roof insulation blanket.
- Colorbond corrugated roof sheeting, gutters, capping’s and downpipe.
- Removal of all rubbish by our team.
PREMIUM INCLUSIONS (STAGE 2)
Internal completion including 1.1m wide front deck with roof covering.
- LED downlights x 6, double power points x 2, light switch x1.
- Earthwool R2.0 x 90mm wall insulation.
- Smooth finished plasterboard to all walls and ceilings.
- Plastered joints with 3 coats of plaster, sanded ready for paint.
- Timber cornices sanded ready for paint.
- 3inch skirting boards and architraves F/J primed pine.
- Installation ONLY of internal floating floor boards(supplied by owner).
- H3 treated pine deck with 90mm smooth treated pine boards with galvanized screws.
OPTIONAL UPGRADES
Supply and install additional costs.
- Additional Sliding window with fly screen.
- Front security screen door (diamond grill).
- External sensor light.
- Internal fan.
- Hardwood decking boards (merbau).
- Skydome skylight
- Daikin 2.5KW reverse cycle air conditioner
EXCLUSIONS
Supply and install of carpet or tiles
- Connection of main power supply from house.
- Rainwater connection (not required by council).
- Painting.
- Supply and installation of handrails.